Basement Finishing in Utah County

Finish the Basement. Keep One Point of Contact.

Rocky Mtn Remodel turns unfinished basements into bedrooms, bathrooms and family rooms across Utah County. We plan it, pull the permit, build it and walk the final inspection with you. One licensed contractor from the first visit to the last. Established 2019 in Pleasant Grove. Look up our Utah contractor license.

★★★★★5.0 Stars on Google
Licensed & Insured #11508280-5501
Established 2019
Reviewed on Google, KSL, and HomeAdvisor

What We Build in Utah County Basements

Most basements start as concrete walls, open joists and a furnace in the corner. That is room your family already owns. We turn it into space you will actually use.

  • Bedrooms. Framed, wired and finished, with an egress window that meets code so the room counts as a bedroom. See basement bedrooms.
  • Bathrooms. A half bath or a full bath with a tile shower, built from an existing rough-in or plumbed from scratch. See basement bathrooms.
  • Family rooms. Open layouts with good lighting and a TV wall or fireplace. See open concept basements.
  • Home theaters. A dedicated room with the wiring planned before the drywall goes up. See home theaters.
  • Bars and kitchenettes. A wet bar or a small kitchen for family and guests. Some cities have extra rules for a second kitchen, and we check them first. See basement bars.
  • Offices, gyms and storage. A quiet place to work, room to exercise, and storage that stays organized.

Whatever the mix, it all goes on one plan. Framing, electrical, plumbing, HVAC, drywall, flooring and paint are run by one contractor, so you always know who to call.

Before We Frame: Moisture, Radon, Ceiling Height, Egress

The walls are the easy part. What we check before framing decides whether your basement stays dry, healthy and legal. We look at all of this on every job.

Moisture and drainage

We look for water stains, white mineral residue, cracks and damp spots on the foundation. We ask how the yard drains in spring. Any water problem gets solved before insulation and drywall cover the walls. Finishing over a wet wall only hides the problem. If we see signs of water, we talk through the fix with you, from grading and gutters to something bigger, before we write the proposal.

Radon

Radon is a natural gas that seeps up from the soil, and the basement sits closest to it. The Utah Department of Environmental Quality says to test the lowest level you live in, and to test again when you start using a basement. We recommend testing before the walls close. If the level is high, a mitigation system is much easier to run through open framing than finished drywall. See Utah DEQ's radon test steps.

Ceiling height

Ducts, beams and drain lines eat into headroom. Utah's residential code calls for at least 7 feet in basement living space and hallways, and beams and ducts may come down to 6 feet 4 inches. Bathrooms and laundry rooms can be a little lower, at 6 feet 8 inches. We measure under every obstruction and plan soffits so the room still feels open.

Egress for every bedroom

Every new basement bedroom needs an emergency escape window, and a window well when the window sits below grade. Many older basement windows are too small. We size the opening, the well and any ladder to code. If a bedroom window needs to grow, we plan the digging, the new opening and the well together. Read our guide to basement egress windows in Utah County.

Electrical panel and plumbing

We check whether your panel has room for new circuits and where any plumbing rough-ins sit. That tells us early if a bathroom or bar needs a sewage ejector pump or the panel needs an upgrade, so there are no surprises after framing.

How a Basement Finish Works With Us

You deal with one contractor from start to finish. Here is how it goes.

1. Walkthrough. We meet you in the basement and listen to what you want the space to do. We take measurements and look at the foundation, the mechanicals and the windows. Bring your wish list and any photos you like. We will tell you plainly what fits and what does not.

2. Written proposal. You get a written proposal with the scope, the schedule and the price before any work begins. Want a starting point first? Try our project estimator for a ballpark cost.

3. Plans and city permit. We draw the plans your city asks for, with every room labeled, window sizes, and the electrical, plumbing and mechanical layout. We submit them, answer plan review questions and pull the permit. If your city asks for extra details, like furnace load calculations, we handle those too. In most Utah County cities the permit takes about 1 to 3 weeks.

4. Framing and rough-ins. Walls, soffits and any new egress window come first. Then the electrical, plumbing and HVAC rough-ins go in. Framing goes fast. Rough-ins take the most coordination, because each trade has to pass before the next one starts. Each stage is inspected before the walls close, and we schedule every inspection.

5. Insulation and drywall. Once the rough inspections pass, insulation goes in, with an inspection where the city calls for one. Then the drywall is hung, taped, finished and textured. This is when the space finally starts to look like rooms.

6. Finishes, final inspection and walkthrough. Paint, flooring, doors, trim, cabinets, fixtures and lights go in. The city does its final inspection. Then we walk the space with you, write down anything that needs a touch up, and finish it. You have one point of contact the whole way through.

Most basement finishes take about 8 to 12 weeks once work starts. Size, bathrooms, bars and theaters all change that, and your proposal includes a schedule built for your basement. See our basement finishing timeline for Utah County.

Basement Permits in Utah County Cities

Utah County cities require a building permit when a basement finish adds walls, wiring or plumbing. We pull it for you, wherever you live. The paperwork changes a little from city to city. Getting it right the first time keeps your project on schedule. Here is what three cities ask for.

Lehi

Lehi takes every application through its Building Permit Submittal Portal. The city's Residential Basement Finish checklist asks for a floor plan with dimensions, window locations and sizes, the electrical, plumbing and mechanical layout, and the contractor's license number. Inspections are booked by phone with a day's notice, not by voicemail, email or online, so we call each one in as the work is ready. More from Lehi Building and Inspections.

Orem

Orem's Residential Basement Finish Plan Checklist spells out what plan review needs: plans to scale, every room labeled with its size and ceiling height, window sizes, and any new beams or headers. A new furnace also needs Manual J and Manual D calculations. Applications go in online. More from Orem building permits.

Provo

Provo reviews a basement finish under its Residential Remodel Checklist. Plans are uploaded as PDFs on the Provo City Online Portal, showing the existing and proposed floor plan with every room labeled. If the plans show a second kitchen, the owner signs a notarized occupancy restriction. Provo's final inspection checklist also looks at bedroom egress and window wells.

Building somewhere else in Utah County? We follow your city's checklist the same way.

Real Basements We've Finished

These are real Rocky Mtn Remodel basements, and every photo comes from the job it is listed under.

American Fork. An open lower level turned into full living space: a shiplap wall around a linear electric fireplace, a white shaker kitchenette with a geometric tile backsplash, a board and batten entry bench, and a bathroom with a white subway tile shower and green vanity. See the American Fork basement.

Vineyard. A wide family room with a TV wall and gray plank flooring, plus a carpeted bedroom. Egress windows bring daylight into both. See the Vineyard basement.

Heber Valley. Built for family and guests: a stone fireplace with built-in bookshelves, a beadboard wet bar, custom wood loft bunks, and a bathroom with a glass walk-in shower and double vanity. See the Heber Valley basement.

What Changes the Cost of a Basement Finish

We don't post one price for every basement, because no two are alike. The estimator gives you a quick starting point for your own basement. These are the things that move your cost the most:

  • Size. More square feet means more framing, drywall and flooring.
  • Bedrooms and egress. A bedroom without a code size window needs a new opening, a window well and some digging.
  • Bathrooms. An existing rough-in helps. Plumbing from scratch or adding an ejector pump adds work.
  • Ceiling work. Soffits around ducts and beams, or moving ductwork, takes time.
  • Heating and cooling. Extending ducts to new rooms, or adding a new furnace, adds work.
  • Finish level. Flooring, tile, cabinets, built-ins and lighting choices make a big difference.
  • Plans and permit. Some jobs need extra drawings or calculations, like a new furnace.

Get a ballpark in the project estimator. After the walkthrough, we confirm everything in a written proposal.

Basement Finishing Near You

We finish basements across Utah County from our home base in Pleasant Grove.

Basement Finishing FAQs

Yes, when the finish adds walls, wiring, plumbing or ductwork. Each city runs its own permit process and inspections. We prepare the plans, pull the permit and schedule every inspection. See the checklists for Lehi, Orem and Provo.
Most take about 8 to 12 weeks once work starts, plus about 1 to 3 weeks for the permit. A small, open basement can move faster. Bathrooms, bars and theaters add time. Your proposal includes a schedule. Read more in our basement finishing timeline.
It depends on the size, how many bedrooms and bathrooms you add, egress windows, ceiling work and the finishes you pick. Get a ballpark in the project estimator, then we confirm it in a written proposal after the walkthrough.
Yes. Utah builds homes to the 2021 International Residential Code, and every new basement bedroom needs an emergency escape opening. That means at least 5.7 square feet of clear opening, or 5 square feet at a grade floor opening, at least 24 inches high and 20 inches wide, with the sill no more than 44 inches above the floor. A window below grade needs a well, with a permanent ladder or steps when the well is deeper than 44 inches. See our egress window guide and basement bedrooms.
Yes. Utah DEQ says to test the lowest level you live in, and to test again when you start using a basement. Test before the walls close if you can. If the result is 4 pCi/L or higher, DEQ suggests a follow up test and a certified mitigation contractor. A system is easier to route before drywall. See Utah DEQ radon testing.
Under the 2021 International Residential Code as adopted in Utah, basement living space and hallways need at least 7 feet. Bathrooms and laundry rooms need at least 6 feet 8 inches. Beams, ducts and other obstructions may come down to 6 feet 4 inches. We measure before we plan.
Yes. If your basement has a plumbing rough-in, we build from it. If not, we cut the slab, run new drain lines, and add an ejector pump when the fixtures sit below the sewer line. It can be a half bath or a full bath with a shower. See basement bathrooms.

What Homeowners Say

★★★★★

Tyler helped us every step of the way in our bathroom remodel. Communication, timing, pricing, organization, expertise, and workmanship were excellent! We'll definitely be contacting this company when we have other projects! This is the first time out of any remodeling projects that we've ever had someone communicate so well and exceed our expectations in every area. If we could give more than 5 stars we would!

Dresden Bush

Bathroom Remodel

Google

★★★★★

I own and operate an Audio-Video company and have worked with Tyler on several projects, which has always been a pleasure. He is responsive, honest, and hard-working. I have had such a good experience working with him that I hired him to help me flip and remodel my home before selling it. Everything was on budget and was able to sell my home quickly after his quality work.

Will Marston

Home Remodel

Google

★★★★★

Tyler with Rocky Mtn Remodel has been amazing to work with. He helped us remodel our kitchen, flooring, and bathroom. He's incredible, he helped us with design and picking out the right colors, our floor and bathroom have turned out amazing. He's got some amazing contractors, Mario that did our bathroom is the best, like seriously the best tile guy. We really felt cared for and that we were a priority. I'd recommend him to anyone. We filed an insurance claim on some water damage from our dishwasher, Tyler helped work back and forth with the agent. When we had issues, he was great at getting them resolved in a timely manner, and is very easy to work with. Tyler has a high standard and holds his contractors to that standard.

Berrett Brady

Kitchen / Flooring / Bathroom

Google

Get Your Basement Estimate

Tell us what you want your basement to do, and we will walk it with you. Get a ballpark in the project estimator or request a consultation.

Request a Consultation